RMT Energy | Construction
RMT Inc.

Sheffield Wind

First Wind

INTERCONNECTING UTILITY:

Vermont Electric Power Company (VELCO)

RMT'S ROLE:

RMT is providing engineering, procurement, and construction of the civil and electrical system Balance-of-Plant (BOP), including the following:

  • Storm water management
  • Spread-footer foundations
  • Access roads, crane pads and walks, and laydown yards
  • 3-phase 34.5-kV electrical collection system
  • Substation/switchyard
  • SCADA systems
  • Turbine erection and tower wiring
  • FAA lighting
  • WTG transporation to the site
  • Operations and maintenance building

PROJECT HIGHLIGHTS:

  • The facility is commenced commercial operation in October 2011
  • The Sheffield Wind facility has the capacity to power approximately 14,500 homes annually

QUICK FACTS:

Sheffield, Vermont
40 MW
Clipper C96 & C93
Turbines