Windstar Wind Farm
Western Wind Energy
INTERCONNECTING UTILITY:
Southern California Edison Company
RMT'S ROLE:
RMT is providing engineering, procurement and construction of the civil and electrical system Balance-of-Plant (BOP), including the following:
- Turbine access roads, crane walks and pads, laydown areas and building platforms
- P&H tensionless pier turbine foundations
- 34.5kV/230kV collector systems
- SCADA/fiber optic communication systems
- Two overhead transmission line taps to interconnect to existing 220kV transmission lines
- Two turnkey substations
- Erection of 37 Gamesa G80 and 23 Gamesa G87 turbines on 67 meter towers, including anchor bolt tensioning, mechanical, and electrical
- Engineering and construction of O&M building
- FAA lighting and meterological tower
- Storm water management design
PROJECT HIGHLIGHTS:
- The facility commenced commercial operation in the fourth quarter of 2011
- Windstar Wind has the capacity to power approximately 32,000 homes annually